Project

Santos Pre-field Development

90km

Pipelines

4.6km

Through State Forest

$13.5m

Packages Value

8km

HV / LV Powerlines

Work packages totaling 90km of water and gas pipelines ranging in size from DN630 to DN110, below ground HV/ LV powerlines, isolation valves, golden welds, hot taps, road and waterway crossings, multiple LPD’s / HPV’s and connections into existing manifolds. The final works package, Narrabri Dewhurst South Project, included 4.6km DN315 HDPE Gas Flowline through the Pilliga State Forest.

The Narrabri project, although short in length and duration was very challenging due to the alignment of the pipeline being the middle of the Pilliga State Forrest, within an existing HDPE Water line corridor, with no new clearing allowed. The pipeline was subject to strict EIS conditions including minimising dust and erosion onsite. To manage the conditions an extensive erosion sediment control plan (ESCP) was designed and implemented.

Project Details

Significant Controls needed from the EIS included:

  • Development of an extensive CEMP that showed the processes and controls for the job
  • Emergency management procedures showing responses to fire and flood
  • Stakeholder support and notification of works
  • Protester compliance training
  • Inductions including Environmental, Cultural Heritage requirements
  • Extensive dilapidation survey of the alignment followed by a post construction survey>25 Rail and Road Thrust Bores up to DN630

LOCATION

Roma, QLD

PROJECT VALUE

11.5m

YEAR

2017

CLIENT

Santos Limited

Related Projects

BMD Construction

Middlemount Coal Pipeline

The Middlemount Coal Mine (Mine) is an open cut coal mine located approximately 270 km west-northwest of Rockhampton and approximately 10 km south west of the township of Middlemount. The work was required to be performed both ON & OFF mine lease for Peabody Energy and Yancoal Australia.

NSW Department of Industry

Nimmie-Caira Wetlands