Project

GLNG – Fairview CSG Gathering Lines

440km

Pipelines

$32m

Contract Value

Zero

LTI’s

DN800

Pipeline Diameter

Mitchell were awarded the contract for completion of 440km DN63 to DN800 Gathering Pipelines for Santos. In addition to the pipelines, Mitchell carried out civil works for completions of HSC04 and HSC05 hubs after the plant became live and under strict permit systems. The civils included procurement and construction of road pavements, drainage, bituminous sealing, concrete works and steel works.

Project Details

  • Major Tie ins
  • Live Digs & connections
  • Pneumatic strength and leak testing
  • Completion of PE pipelines
  • Replacement of GRE pipeline with SDR7.4 PE
  • Completion of Steel pipeline reinstatement
  • CP commissioning
  • Low Point Drains
  • High Point Vents
  • Golden Welds
  • Reinstatement
  • Test Packs
  • Material Data Register
  • Quality documents turnover

LOCATION

Injune, QLD

PROJECT VALUE

32m

YEAR

2014

CLIENT

Santos Limited

Related Projects

BMD Construction

Middlemount Coal Pipeline

The Middlemount Coal Mine (Mine) is an open cut coal mine located approximately 270 km west-northwest of Rockhampton and approximately 10 km south west of the township of Middlemount. The work was required to be performed both ON & OFF mine lease for Peabody Energy and Yancoal Australia.

Carmichael Rail Network

Carmichael Rail Pipeline

The Carmichael coal mine is located in the north Galilee Basin, Queensland, approximately 280km south of Townsville and 300km west of Mackay. The work scope included the construction of a water pipeline and procurement of associated pumping equipment & water storages.